Pacifico Cedar Creek
Pacifico proposes a massive Cedar Creek data center; its pending air application lists 48 gas turbines totaling 1,326 megawatts of maximum nominal output.
The proposed site is already surrounded by homes, schools, childcare, farms and community roads. This is not an appropriate location for industrial-scale development.
What can rows of on-site gas turbines look like in operation?
Floodlight News recorded this January 2026 thermal drone view above xAI’s gas-turbine plant in Southaven, Mississippi. It shows rows of hot stacks and exhaust plumes serving one data-center complex.
This is not Pacifico and it is not a prediction of Cedar Creek. It is a real-world example that helps residents understand the heat, movement and collective scale that ordinary daytime footage can hide. Thermal imagery does not measure pollutant concentrations.
The project at a glance
Four numbers explain the scale.
These are not estimates of a typical data center. They come from Pacifico’s filings and Lost Pines Watch’s current public-record and mapping analysis.
Why residents are concerned
The issue is not technology. It is the location, the missing record and the permit process.
A newcomer should not need to study hundreds of pages to understand the core concern.
Wrong place
This is an existing rural community—not a remote, buffered heavy-industrial district. Homes, schools, childcare and wildfire-prone land already surround the development area.
See the map →The application is public; major eligibility questions remain
The released 54-page filing identifies 48 turbines, six model families, modeled schedules, controls and applicant-calculated emissions. The public record still does not contain TCEQ’s final written eligibility determination, final stack terms, or a fully explained source-wide monitoring method.
Streamlined review with eligibility questions unresolved
Pacifico is pursuing an expedited Electric Generating Unit Standard Permit. Under 30 TAC §116.615(2), representations regarding maximum emission rates become registration conditions. TCEQ should explain in writing how the 48-turbine configuration qualifies and what monitoring and calculation methods make source-wide compliance with each annual limit reliably determinable.
One campus · several approval tracks
Officials should review the whole buildout.
The data-center and power components appear under multiple entity names and approval records; the air application itself principally names Pacifico CCK Energy 1 LLC but later uses Pacifico Cedar Creek LLC, and the released records reviewed do not explain that discrepancy. Newer records show coordinated planning, shared drainage analysis, and plans that depict each other. The August air application identifies 48 turbines and states 1,326 MW of maximum nominal output. Pacifico says its earlier JETI figures are out of date and later described approximately 1,100 MW of nameplate generation and 770 MW delivered, but the released records reviewed do not reconcile those figures with the application’s 1,325.76-MW per-model total, the earlier 710-MW power figure, or the approximately 490-MW IT-load figure. The community deserves one cumulative review—not isolated decisions.
Review the supporting record ↗Our position
Lost Pines Watch is not against responsible data centers or economic development.
We support modern, efficient projects located on appropriately buffered sites and developed with full disclosure, cumulative review, enforceable safeguards and honest compliance with the spirit of the law.
We oppose placing an industrial-scale gas power plant in an established Cedar Creek community before the complete air, water, fire, noise, traffic and cumulative-impact record is public and independently reviewed.
What to do now
Four actions matter now.
Use Permit 185019 / Project 413471 in every call and filing.
Call Gerdes and Schwertner right now
Do this firstTCEQ closed a one-day deficiency cycle and logged a team-leader or supervisor review milestone on September 2. Call Rep. Stan Gerdes at 512-321-3720 and Sen. Charles Schwertner at 512-463-0105. Ask both offices to contact TCEQ immediately, request a hold, demand the full final package and written PSD/ORC answers, and publish the agency’s response.
Send TCEQ a pre-decision technical submission
Do this todayReference Registration 185019 / Project 413471. Ask TCEQ not to approve the registration until it publishes the final package and resolves the emissions, enforceability, PSD-threshold and omitted-ORC questions.
Keep pressure on Cruz, Cornyn and Abbott
After the local callsAsk Cruz and Cornyn to seek TCEQ and EPA Region 6 review, and ask Governor Abbott to press TCEQ publicly before final action. Demand written intervention and publication of every agency response.
Keep pressing Bastrop County
Unfinished workCommissioners Court passed a broader data-center resolution August 24, but the Pacifico air-permit amendment did not pass. Ask the County Judge—or any three commissioners—to call a properly posted special meeting and consider a formal recommendation that TCEQ not approve Registration 185019 until the record and whole-site analysis are complete.
What is Lost Pines Watch?
Independent public-interest research for Bastrop County residents.
We read the filings, check the claims, publish the sources and correct the record when new information arrives.
Verified facts are tied to public records or clearly identified analysis.
Applicant claims are labeled as claims—not repeated as established fact.
Reasoned inferences are separated from proof and explained in plain language.
Unknowns stay visible until the underlying record answers them.
Sources and verification links